Days in a row

Days in a row — consecutive working days — is the longest unbroken run of working days a person may be scheduled for. The limit is what stops a week that is within its hours from being unreasonable about rest.

Why it matters in a small workplace

A long run is built one shift at a time, often across the join between two weeks, so nobody watches it form. It is the rule most often broken by accident rather than by decision.

How Weeksort handles it

A maximum run sits in the same rule set as the hour caps and the rest minimum. Weeksort counts the run inside each schedule week, so a run that crosses into the next week counts as two. Place somebody by hand past the limit and it warns you and lets you go ahead; Auto-assign never breaks it.